Test the plan before the commitment.
A land plan can show an appealing arrangement of homesites, streets and open space. Its next test is whether the property can support that layout at a workable cost and in a workable sequence.
Bring planning and construction into the same review early. Access, utility service and grading deserve attention while there is still room to adjust the concept.
Look at the interfaces.
Start with the places where one decision affects another. A change in street grade can influence driveway conditions. A utility corridor can affect the room available for landscaping. A phase boundary can create a temporary access or infrastructure need.
These connections are easy to miss when each part of the plan is considered separately. Reviewing them together gives the team a more useful set of questions for the next stage of design.
Make assumptions visible.
Early concepts often depend on information that still needs to be confirmed. Rather than letting an assumption quietly become part of the plan, record it. Identify the person responsible for checking it and the decision it affects.
A short, organized list of open questions can be more useful than a confident-looking plan whose underlying assumptions remain unclear.
Define the next decision.
The purpose of early review is not to resolve every detail at once. It is to understand which information is needed now, what can be developed later and what could change the direction of the project.
That makes feasibility a working process: develop the concept, test the important relationships and use the results to make the next decision.
Questions for the project team.
- What has been confirmed about access and utility service?
- Which grading decisions could change the layout?
- What assumptions need specialist or agency input?
- What must be resolved before the next commitment?